摘要
老挝南椰Ⅱ水电站粘土心墙土石坝施工采用合理的施工工序,控制施工料源,合理配置施工资源,施工质量得到了有效地控制,取得了较好的效果。
Construction technique for earth and rockfill dam with clay core at Nam Ngiep 2 hydropower station includes proper construction process,construction material control and reasonable allocation of construction resources. Therefore,construction quality are controlled.
出处
《四川水力发电》
2017年第5期36-38,44,共4页
Sichuan Hydropower
关键词
老挝南椰Ⅱ水电站
粘土心墙土石坝
施工工艺
质量控制
Nam Ngiep 2 hydropower station in Laos
earth and rockfill dam with clay core
construction technique
quality control