摘要 南海某海上平台项目平台主发电机组及钻井系统空调机组为海水冷却机组。为实现平台设备陆地调试最大化,需要临时援引码头海水接入平台正式工艺管线,作为发电机组负载试验的冷却媒介以及提供临时海水至钻井系统空调单元。结合系统特殊要求及试验场地条件,设计了一套满足工艺要求的临时海水冷却系统,其各项指标均达到技术要求,保证了项目主发电机组负载试验的顺利完成。 The platform main generator set and drilling system air conditioning unit of a marine project are sea water cooling unit. In order to maximize the land debugging of the platform, it is necessary to quote the formal process pipeline of wharf seawater access platform temporarily as the cooling medium for generator load test and provide temporary air conditioning to the air conditioning unit of the drilling system. In combination with the special requirements of the system and the site conditions, a set of temporary sea water cooling system is designed to meet the requirements of the process after detailed calculation and practical investigation. All the indexes can meet the technical requirements and ensure the successful completion of the load test of the main generator set.
作者 李明涛
出处 《化工装备技术》 CAS 2017年第5期22-24,27,共4页 Chemical Equipment Technology
关键词 发电机组 负载试验 海水冷却 潜水泵 管道 压力 流量 Generator set Load test Seawater cooling Submersible pump Pipe Pressure Flow
  • 相关文献

参考文献1

同被引文献19

引证文献2

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部