南宁地铁复合地层盾构施工关键技术 被引量:15

Key Technology of Nanning Subway Shield Construction in Composite Strata
下载PDF
导出
摘要 以南宁市轨道交通3号线平乐停车场出入场线盾构区间右线施工为背景,结合工程实际水文地质情况,总结了全断面灰岩地层、上软下硬地层、全断面黏土地层及复合地层条件下小半径曲线段盾构掘进施工关键技术,解决了刀具磨损严重、盾构机抬头、地层沉降、管片错台和破损、掘进效率低下等问题,可为类似地层的盾构施工提供参考。 Taking the right line project construction of shield interval tunnel of Pingle park exit line in Nanning rail transit line 3 as the background,the key technology of shield tunneling construction in the section with small radius curve was concluded by combing with the actual hydrogeological conditions under the circumstances of full-face limestone strata,upper-sof t lower-hard strata,full-face clay strata and composite strata,which could solve the problems including severe wear of the tool,the rise of the shield machine,the stratum settlement,the dislocation and damage of segment and the low efficiency of the tunneling. The technology proposed in this paper can provide a reference for shield construction in the similar strata condition.
出处 《铁道建筑》 北大核心 2017年第10期67-70,共4页 Railway Engineering
关键词 地铁 施工技术 现场试验 盾构隧道 复合地层 小半径曲线 Subway Construction technique Field test Shield tunnel Composite strata Small radius curve
  • 相关文献

参考文献8

二级参考文献29

共引文献266

同被引文献129

引证文献15

二级引证文献103

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部