期刊文献+

大岗山水电站线路事故跳闸应急处理方案 被引量:1

Emergency Treatment Schemes for the Tripping caused by Transmission Line Accidents in Dagangshan Hydropower Station
下载PDF
导出
摘要 面对雨雪冰冻、强对流天气等气象灾害引起线路倒杆、闪络等事故,造成500 kV开关站全站停电,继而可能造成全厂交流电源全部失电,运行人员需要有极高的事故处理能力和灵活应对能力。为了防止大岗山水电站线路全停可能带来的危害,提出了几种情况下的应急处理方案。 Extreme weather conditions such as heavy rainfall,snow,freezing or severe convection weather could cause accidents of the transmission line such as the tower collapse or flashover,It may then result in further consequences of the electricity failure of the 500 kV switch station and even the AC power supply shutdown of the whole plant. To improve the emergency treatment ability of the operational staff and prevent the damages caused by the total failure of the electricity supply in Dagangshan Hydropower Station,several emergency treatment schemes for different cases are provided.
作者 胡畅 HU Chang(China Guodian Dudu River Dagangshan Hydropower Development Co. , Ltd. , Shimian 625409, Chin)
出处 《水电与新能源》 2017年第10期56-59,共4页 Hydropower and New Energy
关键词 大岗山水电站 线路跳闸 全厂停电 处理方案 Dagangshan Hydropower Station line tripping electricity failure of the whole plant treatment scheme
  • 相关文献

同被引文献6

引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部