摘要
寺家庄煤业公司改变有掘必探和构造探测两张皮的状况,将有掘必探和探测构造很好地结合了起来,发挥了"一孔多用"的作用,减少了探测次数和占用巷道时间,从而提高了巷道掘进效率,节约了费用支出。
To improve the situation that no exploration and no excavation was inconsistent with the structural exploration, the Sijiazhuang coal company is very good combination of the two, play a "multipurpose by hole" effect, reduce the detection number and occupancy time, improve the the roadway excavation efficiency, and save the expenses.
出处
《山东煤炭科技》
2017年第10期147-148,共2页
Shandong Coal Science and Technology
关键词
有掘必探
构造探测
结合
no exploration and no excavation structural exploration combination