摘要
回顾了我国矿井施工组织设计发展历程,指出矿井施工组织设计应结合矿井建设特点,解决建设中的难点。其核心是以经济效益为中心,对建设方案进行优化,重点是工期优化及提升运输、通风、排水等系统构建。工期优化与系统构建是一个整体,必须统筹考虑,用系统保证工期目标实现。
The paper had a review on the development course of the mine shaft construction organization design and pointed out that the design of the mine shaft construction should combine the mine shaft construction features and should solve the difficulties from the construction.Based on the economic benefit as the central,the core was to optimize the construction plan and the key was to optimize the construction period and to establish the hoisting transportation,ventilation,water drainage and other system.The construction period optimization and the system establishment would be integration and should be an overall planning in consideration.The system should be applied to ensure the realization of the construction period target.
作者
杨怀敏
龚炳江
蓝成仁
孟志强
YANG Huaimin GONG Bingjiang LAN Chengren MENG Zhiqiang(Hebei University of Engineering, Handan 056038, Chin)
出处
《建井技术》
2017年第3期1-4,共4页
Mine Construction Technology
关键词
矿井
施工组织
建设方案
工期优化
经济效益
mine shaft
construction organization
construction plan
construction period optimization
economic benefit