千米立井揭煤施工 被引量:1

Seam Opening Construction in 1 000 m Depth Mine Shaft
下载PDF
导出
摘要 淮南潘三矿千米立井深部施工中,需揭穿4-1突出煤层。揭煤前,采用前探释放抽排技术,在距煤层顶板不同法距位置,进行多次探放,使瓦斯含量降到安全范围内,最后顺利通过。简要介绍了揭煤前期准备工作、揭煤施工工艺及揭煤施工安全技术措施。 In the depth section construction of a 1 000 m depth mine shaft in Huainan Pansan Mine,No.4-1 outburst seam should be opened.Before the seam opened,apilot gas released and gas drainage technology was applied.At the location with different distance to the seam roof,several gas releasing were conducted in order to make the gas content reduced to a safety scope and finally the construction was successfully passed through the seam.The paper briefly introduced the early preparation work of the seam opening,the seam opening construction technology and the safety technical measures of the seam opening construction.
作者 梁增龙 LIANG Zenglong(China Coal No. 5 Construction Company Limited,Xuzhou 221140,China)
出处 《建井技术》 2017年第3期8-10,45,共4页 Mine Construction Technology
关键词 千米立井 突出煤层 揭煤施工 防突措施 1000 m depth mine shaft seam outburst seam opening construction outburst prevention measures
  • 相关文献

参考文献4

二级参考文献8

共引文献30

同被引文献1

引证文献1

二级引证文献2

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部