摘要
从班组环境因素、组织因素等方面,对岩巷钻爆法掘进班组员工的工作压力作了分析,得到以下认识:岩巷钻爆法掘进班组员工的压力源,可分为组织因素、个体因素和环境因素3个方面,它们的影响程度各不相同;积极应对压力,有助于减轻班组成员的心理压力,减小压力对员工所造成的伤害,提高岩巷掘进工效,保证施工安全。
From the environment factor,organization factor and others of the team,an analysis was conducted on the work stress of the working crew in the drilling and blasting heading team of the mine rock roadway.The following understandings were obtained.The work stress sources of the working crew in the drilling and blasting heading team of the mine rock roadway could be divided to three aspects,including the organization factor,personal factor and environment factor.Each influence degree of the factors would be different.To actively deal with the work stress could be favorable to reduce the psychological stress of the team crew,to reduce the stress harm occurred to the crew,to improve the heading efficiency of the mine rock roadway and to ensure the construction safety.
作者
黄宝龙
单仁亮
董韶华
HUANG Baolong SHAN Renliang DONG Shaohua(Research Institute of Mine Construction, Tiandi Science and Technology Company Limited ,Beijing lO0013,China School of Mechanics and Civil Engineering ,China University of Mining and Technology(Beijing) ,Beijing 100083,China)
出处
《建井技术》
2017年第3期35-38,共4页
Mine Construction Technology
关键词
岩巷掘进
钻爆法
班组
压力分析
heading of mine rock roadway
drilling and blasting method
team
work stress analysis