7Pomeranz,Fehx. Conrtol construction costs with preemptive auditing[J].Power, 1983,127 (4) : 65-67.
8Rice,Sherry M. Preaward conrtact audits:a claims avoidance procedure[J].Transactions of the American Association of Cost Engineers, 1991 :E31-E33.
9Wyse,Donald D,Malik,Saahil. Audit contract provisions and real-time cost reporting in construction contracting[J]. Journal of Professional Issues in Engineering Education and Practice ,2005,131 (4) :297-300.
10Jergeas,Geogre F,McTague,Robert. Construction productivity:an auditing and measuring tool [C]. The 46th Annual Meeting of AACE International, Jun23-26,2002, Portland, OR, United States.