主要介绍了针对牛塘隧道设计中出现的岩溶、裂隙以及高水压段系统采取的超前预报、衬砌特殊设计、采用加设中心沟等采取的有效措施,以及针对在施工及运营期间产生的隧道渗漏水问题采取的处置措施。
This paper mainly introduces the effective measures in Niutang tunnel design according the sections appearing the karst, crack and high water pressure, the measures are advanced forecasting, special design of lining, and adding center ditch and so on, then puts forward the countermeasures for leakage problem existing in tunnel construction and operation.
作者
袁博怀
YUAN Bo-huai(CCCC First Highway Construction Co. Ltd., Xi'an 710000, China)
出处
《工程建设与设计》
2017年第20期68-70,共3页
Construction & Design for Engineering
关键词
隧道
岩溶
地下水
处置措施
tunnel
karst
groundwater
disposal measure