4[7]John W Lamont, Jian Fu. Cost analysis of reactive power support [J]. IEEE Transaction on Power System, 1999,14(3): 890-898.
5[8]Hao S. Reactive power pricing and management [J]. IEEE Transaction On Power Systems, 1997,12 (1): 95-104.
6[10]BrendanKirby, EricHirst. Maintaining system black start in competitive bulk-power market [C]. Proceedings of the American Power Conference. Chicago: IL, 1999.
7[11]Eric Hirst. Unbundling electric-power services [R]. Oak Ridge National Laboratory Working Paper, 1997.
8[12]Goran Strbac, Daniel S Kirschen. Who should pay for reserve? [J]. The Electricity Journal, 2000,10: 32-37.
9[8]TUAN L A, BHATTACHARYA K. Competitive Framework for Procurement of Interruptible Load Services. IEEE Trans on Power Systems, 2003, 18(2): 889-897.
10[9]CHEN C S, LEU J T. Interruptible Load Control for Taiwan Power Company. IEEE Trans on Power Systems, 1990, 5(2):460-465.