摘要
根据国网公司的相关推进计划及工作要求,严格按照国网公司项目进度安排,及时反馈相关报表,开展绝缘横担运行的各类数据收集和分析工作,深入开展绝缘横担适用性和安装工艺的探索,为绝缘横担的改进提出更多的参考建议,确保试点工作顺利开展和效果分析。
According to the relevant requirements and plans to promote the work of the State Grid Corporation, it timely feedbacks positive statements and runs all kinds of insulation data collections and analysis. It explores insulation crossarm applicability and installation process to put forward more suggestions, to improve the insulation crossarm and ensure the smooth implementation of the pilot work and effect analysis.
出处
《湖南电力》
2017年第A02期102-105,共4页
Hunan Electric Power
关键词
10KV配电线路
绝缘横担
闪络
雷击断线
直线杆
耐张杆
10 kV distribution line
insulation cross load
flashover
lightning break
straight bar
tension bar