6HILLENBRAND H G. Meeting Highest Requirements for the Challenge of the Nordd Stream Project [ C ]// Pro- ceedings of Pipeline Technology Conference. Ostend: [ s. n. ] ,2009:55 -60.
7IGOR PYSHMINTSEV. New XS0 Grade 1420mm Pipes Designed for 11.8 MPa Operation Pressure. Crack Ar-rest and Main Technical Requirements [ C j//2010 国际管线工程技术会议论文集.北京:[s.n.],2010:7-12.
8GLOVER A. The Application of X100 to Gas PipelineProjects[ C ]//高钢级管线钢焊接技术交流会论文集.廊坊:[S.n.],2010:23-27.
9ANDREAS L, FABIAN G, LUDWIG O. State-of-the-Art Quality Control During Production of SAW Linepipes [ C ] //Proceedings of 2002 4th International Pipeline Conference (IPC2002). Calgary : [ s. n. ], 2002 : 389 - 394.
10MARLIER O. Europipe's Approach to Consistently Produce High Quality Pipes for Today and Tomorrow's Mar- ket [ C ] //Proceedings of Pipeline Technology Conference. Ostend: [s. n. ] ,2009:25 -31.