3Goyal SK. An integrated inventory model for a single supplier-single customer problem [ J ]. International Journal of Production Research, 1976, 15:107- 111.
4Hill RM. The single-vendor single-buyer integrated productioninventory model with a generalised policy [ J ]. European Journal of Operational Research, 1997, 97 : 493 - 499.
5Hill RM. The optimal production and shipment policy for a singlevendor single-buyer integrated production-inventory problem [ J ]. International Journal of Production Research, 1999, 37:2463 - 2475.
6Liao C J, Shyu CH. An analytical determination of lead time with normal demand[J]. International Journal of Operations & Production Management, 1991, 11 : 72 - 78.
7Pan CHJ, Yang JS. A study of an integrated inventory with controllable lead time [ J ]. International Journal of Production Research, 2002, 40 (5), 1263 - 1273.
8Ouyang LY, Wu KS, Ho CH. Integrated vendor-buyer cooperative models with stochastic demand in controllable lead time [ J ]. International Journal of Production Economies, 2004, 92 : 255 - 266.
9Valentini G, Zavanella L. The consignment stock of inventories: Industrial case and performance analysis[J]. International Journal of Production Economics, 2003, 81(11) : 215 - 224.
10Hung JS, Fun YP, Li CC. Inventory management in the consignment system[J]. Production and Inventory Management Journal, 1995, 36 (4): 1-6.