多哈新港挖入式港池防渗墙止水帷幕效果研究 被引量:1

Research on Effect of Cut-off Curtain of Diaphragm Wall in Dredged-in Harbor Basin of Doha New Port
下载PDF
导出
摘要 基坑止降水对基坑的稳定具有重要作用,尤其是超大港池基坑。本文依托卡塔尔多哈新港项目,介绍港池基坑防渗墙构造,通过有限元数值模拟对四个工况的防渗墙的设置分析其防渗墙止水帷幕的截水效果,并进行现场水位观测进行验证。为后期类似项目尤其是国内建设企业在国外如中东地区的相关投资建设项目提供参考,并产生良好的经济,社会效益。 The dewatering and cut-off of foundation pit play an important role in the stabilization of foundation pit,especially for ultra-large foundation pit of harbor basin.An introduction to the diaphragm wall of foundation pit is made based on Doha new port project in Qatar,and the effect of cut-off curtain of diaphragm wall under four working conditions is analyzed by using finite element numerical simulation,which is also verified according to the result of field water level measurement.The analysis results will serve as a reference for similar projects,especially the Middle East projects invested by Chinese construction enterprises in the future,create economic and social benefit.
出处 《港工技术》 2017年第5期30-32,共3页 Port Engineering Technology
关键词 多哈新港 挖入式港池 防渗墙 止水帷幕 防水效果 港口工程 港口建设 Doha new port dredged-in harbor basin diaphragm wall cut-off curtain waterproof effect port engineering harbor construction
  • 相关文献

参考文献5

二级参考文献18

  • 1吴贤国,姚春桥,余群舟,骆汉宾,王远征.某地铁深基坑施工中广电大楼的沉降控制[J].土木工程学报,2011,44(S1):177-181. 被引量:5
  • 2何洪民,薛建萍.垂直铺塑技术在堤防基础截渗工程中的应用[J].水利科技与经济,2006,12(7):474-475. 被引量:2
  • 3夏可风.水利水电工程施工手册:地基与基础工程[M].北京:中国电力出版社,2004.301-303.
  • 4SL 174-1996水利水电工程混凝土防渗墙施工技术规范[S].
  • 5张蔚榛.地下水非稳定运动[M].北京:科学出版社,1989..
  • 6刘汉东,等.岩土工程计算方法[M]郑州:黄河出版社,1995.
  • 7DL/T5200-2004,水利水电工程高压喷射灌浆技术规范[S].
  • 8SL352-2006.水工混凝土试验规程[S].
  • 9GB50734-2012冶金工业建设钻探技术规范.
  • 10日本建设机械协会编.地下连续墙设计与施工手册.北京:中国建筑工业出版社,1983.

共引文献10

引证文献1

二级引证文献10

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部