摘要
介绍了某煤炭码头翻车机房维护工程基坑监测实例,结合具体实际工程情况,对基坑的地下连续墙的侧向水平位移和钢筋混凝土水平对撑应力进行系统详尽的分析,得出一些有价值的结论,确保施工过程安全可靠,并且为后续类似工程监测提供一定的借鉴。
Based on the foundation pit monitoring results in the car dumper maintenance project of one coal terminal,by referring to the engineering detail,a systematic and comprehensive analysis is carried out for the lateral displacement of concrete diaphragm wall and the horizontal stress on the reinforced concrete twin-support.Some valuable conclusions have been made,which will guarantee a safe and reliable construction process,and provide a reference for similar engineering monitoring items in the future.
出处
《港工技术》
2017年第5期104-106,共3页
Port Engineering Technology
关键词
地下连续墙
位移与内力
基坑监测
concrete diaphragm wall
internal force and displacement
pit foundation monitoring