摘要
通过对乌马河大桥处于地质断层处的(2)号墩、(3)号墩桩基础进行计算分析,得出该两桥墩基础存在沉降差,并提出成桥预压沉降、选用大调高量支座等控制沉降差的措施,对位于地质性状突变或地质变化剧烈的地基基础不均匀沉降控制具有一定参考价值.
Based on the calculation and analysis of the No.2 and No.3 Pile Foundation of Pier at the geological fault of the Uma River Bridge, it is concluded that there is a settlement difference between the two piers.The use of bridge preloading settlement, high adjustable support and other measures are proposed to control the settlement difference.The result has a certain reference value for the uneven settlement of the foundation based on the abrupt change of geological traits or the geological changes.
作者
王学刚
WANG Xuegang(China Railway 18th Bureau Group Co., Ltd. Survey and Design Institute, Hexi, Tianjin 300222, China)
出处
《湖南城市学院学报(自然科学版)》
CAS
2017年第4期22-25,共4页
Journal of Hunan City University:Natural Science
关键词
高速铁路
桥梁
地质断层
沉降
预压
大调高量支座
high - speed railway
bridge
geological fault
settlement
preload
high adjustable support