期刊文献+

“起重机+过跨车”铁水物流多场景仿真 被引量:4

Design of Multi-Scenario Simulation of Molten Iron Logistics System with Cranes and Cross-Train AGVs
下载PDF
导出
摘要 大型钢铁联合企业倾向于采用"起重机+过跨车"铁水运输物流新工艺,如何评估其安全性和性能是决策者关心的关键问题。采用仿真评估技术,需要解决由于生产处理时间不确定和"避车"等动态因素导致的多场景仿真问题。为此,提出面向对象仿真对象设计方法和基于有限状态自动机动态建模技术。介绍了铁水运输物流过程的仿真系统,并且给出多场景仿真评估流程。有效的提高了仿真系统的灵活性、可配置性和仿真对象的可重用能力。 Iron and steel complexes prefer a new molten iron logistics technology which involves cranes and cross-train AGVs (Automated Guided Vehicle) for transportation. The key concern of decision-makers is how to evaluate the safety and performance of the logistics design. For using simulation, it needs to solve the multi-scenario what-if simulation problems caused by uncertain processing time and crane yielding. An object-oriented simulation design method and finite state automata based modeling techniques were introduced. A multi-scenario simulation procedure was introduced. The proposed techniques can improve the flexibility, configurability and reusability of the simulation system effectively.
出处 《系统仿真学报》 CAS CSCD 北大核心 2017年第10期2549-2555,共7页 Journal of System Simulation
基金 国家自然科学基金(61473071)
关键词 铁水物流 铁水运输 物流仿真 离散事件仿真 面向对象仿真建模 多场景仿真 molten iron logistics molten iron transport logistics simulation discrete event simulation object oriented simulation modeling multi-scenario what-if simulation
  • 相关文献

参考文献7

二级参考文献28

  • 1庞新富,俞胜平,张志宇,郑秉霖,柴天佑.炼钢-连铸生产优化重调度方法[J].系统工程学报,2010,25(1):98-103. 被引量:26
  • 2龙德,么健石,徐心和.铁水运输系统智能仿真模型[J].东北大学学报(自然科学版),2005,26(6):523-526. 被引量:9
  • 3杨必云.马钢新区总图规划的探析[J].工程建设与设计,2007(4):5-9. 被引量:2
  • 4Fateh Kaakai,Said Hayat,Abdellah El Moudni.A hybrid Petri nets-based simulation model for evaluating the design of railway transit stations[J].Simulation Modelling Practice and Theory,2007,15(8):935-969.
  • 5Ello A G Weits.Simulation of railway traffic control[J].International Transactions in Operational Research,1998,5(6):461-469.
  • 6Averill M Law,W David Kelton.Simulation modeling and analysis[M].New York:The McGraw-Hill Companies,Inc.,1991.
  • 7殷瑞珏.冶金流程工程学[M].北京:冶金工业出版社,2004.
  • 8Wang Gongshu, Tang Lixin. A column generation for locomotive scheduling problem in molten iron transportation[C]//Proceedings of the IEEE International Conference on Automation and Logistics. Piscataway, NJ, USA: Institute of Electrical and Electronics Engineers Computer Society, 2007: 2227-2233.
  • 9Tang Lixin, Wang Gongshu, Liu Jiyin. A branch-and-price algorithm to solve the molten iron allocation problem in iron and steel industry[J]. Computers & Operations Research, 2007, 34(10): 3001-3015.
  • 10Wang Feng, Liu Yuan, Xu Anjun, et al. Modeling and calculation for the molten iron preparation problem based on production scheduling of steelmaking area[C] //Proceedings of the 2nd International Conference on Modeling and Simulation. Liverpool, United Kingdom: World Academic Union, 2009:308-313.

共引文献45

同被引文献57

引证文献4

二级引证文献15

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部