期刊文献+

建筑工程施工材料管理措施分析

Analysis of Construction Materials Management Measures for Construction Projects
下载PDF
导出
摘要 为保证建筑工程项目的顺利开展,针对施工过程中材料管理方面存在的浪费多,质量次,价格高,周期长等问题,提出了合理规划场地,严把质量关,多方询比对价,提前规划策划等措施,并指出了节约减废,流程把控,及时分析,全面策划等管理措施。 In order to ensure the smooth development of construction projects, a lot of measures such as reasonable planning site,strict quality demand, price comparison, planning ahead of schedule were put forward aiming at the problems of material waste, the low quality, the high price and the long period in the construction process, and pointed out other management measures such as saving waste,controlling processes, timely analysis, comprehensive planning.
作者 刘斌
出处 《建筑技术开发》 2017年第9期71-72,共2页 Building Technology Development
关键词 施工材料 管理措施 资源控制 construction management resource control
  • 相关文献

参考文献2

二级参考文献19

  • 1张建平,曹铭,张洋.基于IFC标准和工程信息模型的建筑施工4D管理系统[J].工程力学,2005,22(S1):220-227. 被引量:108
  • 2冯国会,曹广宇,于瑾,陈旭东,胡艳军.夏季昼夜温差较大地区相变墙蓄冷可行性分析[J].沈阳建筑大学学报(自然科学版),2005,21(4):350-353. 被引量:29
  • 3Eastman C,Teicholz P,Sacks R. BIM handbook[M].New Jersey:John Wiley and Sons,Inc,2010.
  • 4Yang D,Eastman C M. A rule-based subset generation method for product data models[J].Computer-Aided Civil and Infrastructure Engineering,2007,(02):133-148.doi:10.1111/j.1467-8667.2006.00476.x.
  • 5Singh V,Gu N,Wang X. A theoretical framework of a BIMbased multi-disciplinary collaboration platform[J].Automation in Construction,2011,(02):134-144.
  • 6Liu Qiang,Zhang Jianping,Li Ding. Research of building information modeling and model transformation technology based on the IFC[A].2012.
  • 7Zhang Jianping,Hu Zhenzhong. BIM-and-4D-based integrated solution of analysis and management for conflicts and structural safety prohlems during construction: 1 principles and methodologies[J].Automation in Construction,2011.155-166.
  • 8Hu Zhenzhong,Zhang Jianping. BIM-and-4D-based integrated solution of analysis and management for conflicts and structural safety problems during construction:2.development and site trials[J].Automation in Construction,2011.167-180.
  • 9Liang Xiong,Lu Ming,Zhang Jianping. Integration of as-built and as-designed models for positioning control during construction[J].Automation in Construction,2011,(03):234-246.
  • 10王宏丽,李晓野,邹志荣.相变蓄热砌块墙体在日光温室中的应用效果[J].农业工程学报,2011,27(5):253-257. 被引量:80

共引文献643

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部