摘要
荒沟抽水蓄能电站上水库土建及金属结构安装工程施工(C1标段)招标文件评审会在北京组织召开,与会专家对荒沟抽水蓄能电站上水库招标设计方案提出了优化建议,本文对相关优化方案进行了总结分析,以便后续工程借鉴。
The power station on the reservoir construction and installation engineering construction metal structure in Huanggou Pumped Storage Power ( section C1 ) bidding document review will be held in Beijing. The tender documents including civil works, construction and metal structure installation ( C1 tenders ) .The experts optimization proposal for the tender design of the upper reservoir belongs to Huanggou Pumped Storage Station .this paper summarizes the relevant optimization analysis for subsequent reference works.
出处
《水电与抽水蓄能》
2017年第B09期4-6,16,共4页
Hydropower and Pumped Storage
关键词
荒沟抽水蓄能电站
面板堆石坝
铺盖及盖重
防渗技术
导流方式
Huanggou Pumped Storage Power Station
Rockfilldam
Linen and cover weight
Seepage Control Technique
Diversion Way