期刊文献+

基于平衡计分卡的PPP项目绩效评价体系构建——以池州市污水处理项目为例 被引量:5

Construction of PPP Project Performance Evaluation System Based on Balanced Score Card :Taking Chizhou Sewage Treatment Project as an Example
下载PDF
导出
摘要 PPP项目融资方式在公共基础设施领域实践经验积累较多,最近几年应用也越来越广泛。但受传统项目绩效评价体系的影响,PPP这种新兴的项目融资模式的绩效管理问题仍得不到妥善地解决,无法建立有效的项目评价体系。因此针对PPP目前绩效评价体系的缺失问题,论题基于平衡计分卡的基本原理,应用层次分析法,建立以财务能力、内部控制管理、创新与发展、利益相关者四个维度考虑各方利益的整体绩效评价体系,并明确界定绩效评价指标,为PPP管理者制定决策方案提供了一定的依据。 The PPP project financing way in the field of public infrastructure has accumulated more practical experience in recent years,more and more widely used. However,due to the impact of the traditional project performance evaluation system,the performance management of PPP,which is a new project financing model, has not been properly resolved,and it is impossible to establish an effec- tive project evaluation system.So in view of the current problem of the lack of PPP performance evaluation system,the thesis is based on the basic principle of Balanced Score Card, and adopts the analytic hierarchy process (AHP) to establish the overaU performance evaluation system considering the interests of all parties in terms of financial capability,internal control management, innovation and de- velopment, stakeholders in four dimensions,and clearly define the performance evaluation indicators,which provides a basis for PPP managers to make decisions.
作者 彭艳 项桂娥 雷红霞 Peng Yan Xiang Gui-e Lei Hong-xia(Chizhou University, Chizhou Anhui 247000,China Hohai University,Nanjing Jiangsu 211100, China)
机构地区 池州学院 河海大学
出处 《铜陵学院学报》 2017年第4期112-115,共4页 Journal of Tongling University
基金 2016年度安徽省软科学研究项目"基于可持续发展视角地方基础设施PPP项目实施的关键因素及评估研究"(1607a0202063) 2017年度安徽省高校人文社会科学项目(SK2017A0641) 2016年度池州学院科研项目(2016RW010)
关键词 平衡计分卡 PPP融资模式 层次分析法 绩效评价 balance score card PPP financing mode AHP performance evaluation
  • 相关文献

参考文献6

二级参考文献57

  • 1陈建平,严素勤,周成武,周俐平,李荣华,马进.公私合作伙伴关系及其应用[J].中国卫生经济,2006,25(2):78-80. 被引量:12
  • 2孟宪海.关键绩效指标KPI——国际最新的工程项目绩效评价体系[J].建筑经济,2007(2):50-52. 被引量:37
  • 3颜艳梅,李林,舒强兴.基于平衡记分卡法的公共工程项目绩效评价指标设计[J].社会科学家,2007,22(1):168-170. 被引量:13
  • 4张跃华,史清华,顾海英.农业保险需求问题的一个理论研究及实证分析[J].数量经济技术经济研究,2007,24(4):65-75. 被引量:116
  • 5AHADZI M, BOWLES G. Public-private Partnerships and Contract Negotiations:an Empirical Study[ J]. Construction Management and Econom- ics,2004,22(9) :967 -978.
  • 6Yuan J F,Miroslaw J S,Li Q M,Zheng L. Performance Objectives Selection Model in Public Private Partnership Projects Based on the Perspective of Stakeholders[J].Journal of Management in Engineering,2010,(02):89-104.doi:10.1061/(ASCE)ME.1943-5479.0000011.
  • 7Egan J. Rethinking construction:report of the construction task force on the scope for improving the quality and efficiency of UK construction[R].Department of the Environment,Transport and the Region,London,1998.
  • 8TurnerRJ. The Handbook ofProject-Based Management[M].London:McGraw-Hill Companies,1993.
  • 9Atkinson A A,Waterhouse J H,Wells,R.B. A stakeholder approach to strategic performance measurement[J].Sloan Management Review; Cambridge,1997,(03):25-37.
  • 10Wateridge J. How can IS/IT projects be measured for success[J].international Journal of Project Managment,1998,(01):59-63.doi:10.1016/S0263-7863(97)00022-7.

共引文献142

同被引文献54

引证文献5

二级引证文献9

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部