砌石坝新老混凝土面板结合技术与效果分析 被引量:2

Combination technology and effect analysis of new and old concrete face slab for masonry dam
下载PDF
导出
摘要 我国砌石坝数量众多,且绝大多数采用上游混凝土面板防渗。许多砌石坝因坝体变形且年久失修,防渗面板逐渐失效而发生渗漏,需要在老的混凝土防渗面板上游侧新建混凝土防渗面板,新老混凝土防渗面板之间的可靠结合是防渗加固成功与否的关键,但现行规范尚未对此提供成熟的加固技术方案。笔者提出采用锚固与粘结两种措施相结合的技术,对已采用该技术的某水库砌石坝新老混凝土防渗面板监测成果的分析表明,采用此技术可使新老混凝土防渗面板可靠结合,保障此类砌石坝面板加固后的防渗效果。 There are a large number of masonry dams in China, most of which use concrete face slab asupstream seepage prevention. Because of dam deformation and disrepair, many face slabs of masonrydam gradually fail and leak. It is necessary to build a new concrete face slab on the upper side of theold. The reliable combination of the new and old concrete face slab is the key to anti-seepage reinforce-ment, but the existing codes have not yet provided a mature technical scheme. In this paper, a techniquescheme of combining anchorage and bond is proposed. Based on the monitoring result analysis of theproject that has adopted the technology, it is indicated that the new technology can make reliable combi-nation of the new and old concrete face slab.
出处 《大坝与安全》 2017年第4期52-56,共5页 Dam & Safety
关键词 砌石坝 防渗面板 结合 监测 masonry dam anti-seepage face slab combination monitoring
  • 相关文献

参考文献3

二级参考文献5

共引文献3

同被引文献6

引证文献2

二级引证文献4

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部