摘要
本文简要介绍了引洮供水工程概况,分析总结了引洮供水工程的施工负荷特点及量值,结合当地电网发展现状,确定了引洮供水工程的供电电压等级、接入电网方式,满足了施工负荷要求,为引洮供水工程的建设提供了保障。
In the paper,the profile of Taohe River Water Diversion and Water Supply Project is briefly described. Theconstruction load characteristics and quantity values of this Project is analyzed and summarized. Local power grid development situation is combined for determining power supply voltage level and power grid connection mode of the Taohe River Water Diversion and Supply Project,thereby meeting the construction load requirements and providing guarantee for construction Taohe River Water Diversion water and Supply Project.
出处
《中国水能及电气化》
2017年第9期33-34,39,共3页
China Water Power & Electrification
关键词
引洮供水
供电方式
研究
Taohe River Water Diversion and Supply
power supply mode
study