摘要 文章结合云桂铁路对门山隧道穿越强风化软质粉砂岩地层出现的大变形问题,在现场地质调查、研究及监控量测数据分析的基础上,提出了针对性的变形控制措施。在对门山隧道施工过程中,通过选择合理的开挖方式、合理优化支护措施、采用可调整式钢拱架、设置超前导洞及超前钻孔释放应力、加大变形预留量等措施有效地控制了围岩变形。本隧道所采取的变形控制技术措施达到了有效控制软岩大变形的目标。 Combined with the large deformation problem when the Duimenshan Tunnel of Yungui Railway throughout the strong weathering soft siltstone strata, the paper puts forward the targeted deformation control measures on the basis of the analysis of the field geological survey, research and monitoring measurement data analysis. In the construction process of the Duimenshan tunnel, through the measures of selecting reasonable excavation methods, reasonably optimizing the support measures, using adjustable steel arch, setting the lead hole and the leading hole release stress, and increasing the amount of deformation reserve, the deformation of the surrounding rock is effectively controlled. The deformation control technology measures achieve the goal of effective control of soft rock deformation.
作者 才泳
出处 《价值工程》 2017年第33期100-102,共3页 Value Engineering
关键词 铁路隧道 软质围岩 大变形 控制措施 监控量测 railway tunnel soft surrounding rock large deformation control measure monitoring measurement
  • 相关文献

参考文献3

二级参考文献27

共引文献118

同被引文献8

二级引证文献2

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部