摘要
绩效评价方法科学与否直接影响项目管理水平的高低。为评价新农村基础设施项目绩效,论文采用模糊综合评判法对评价指标进行量化处理;为解决传统赋权方法存在的主观因素影响大的问题,论文采用有序加权算子赋权的方法,削弱极值影响,使得综合评判结果更具有可靠性。通过实证分析及对评价结果的比较,该方法可以很容易的发现项目管理中的漏洞,从而提出针对性的改进建议,结果表明该方法具有合理可行性。
Whether the performance evaluation method is scientific or not has a direct impact on the level of project management. In order to evaluate the performance of infrastructure projects in new rural areas, fuzzy comprehensive evaluation method is adopted to quantify the evaluation indexes; In order to minimize the influence of extreme value, the method of ordered weighted operator is used to make the comprehensive evaluation result more reliable. Through the empirical analysis and the comparison of the evaluation results, this method can easily find loopholes in the project management, so as to put forward some suggestions for improvement. The result shows that this method is reasonable and feasible.
出处
《价值工程》
2017年第34期54-57,共4页
Value Engineering
基金
湖南省社会科学基金项目(12YBA343)
湖南省社会科学基金项目(2017JJ3519)
关键词
模糊综合评判法
新农村
基础设施项目
绩效评价
fuzzy comprehensive evaluation method
new rural area
infrastructure project
performance evaluation