结合某集装箱船在建造过程中锚系各部件的定位、安装、研配、调试的具体步骤,通过经验分析和严格的质量控制,总结出现场检验的关注要点。
The steps of locating, installation, grinding and debugging of the moored parts in the process of construction of a container ship were discussed about. By means of empirical analysis and strict quality control, the key points in on-site inspection of mooring system installation were summarized.
作者
王亮
WANG Liang(Qinhuangdao Branch of China Classification Society, Qinhuangdao Hebei 066000, Chin)
出处
《船海工程》
北大核心
2017年第A02期146-147,152,共3页
Ship & Ocean Engineering
关键词
锚系
锚唇
锚台
锚链筒
锚链管
掣链器
精度控制