风力发电机雷电放电全过程电流测量系统设计 被引量:3

Design of Whole Process Current Measurement System for Lightning Striking Wind Turbine
下载PDF
导出
摘要 为研究风机被雷击时的全过程电流,利用电磁暂态仿真软件ATP仿真雷击风机叶片时各部位雷电流,并进行频谱分析。通过总结分析仿真结果,设计了雷击风机放电全过程电流测量系统。系统选取罗氏线圈以及无感电阻为传感器,罗氏线圈安装于轮彀和塔筒处,无感电阻安装于叶片中。传感器与雷电测量单元连接,测量单元将测量结果通过光纤传输到终端。性能测试结果表明该系统满足雷电流波形采集要求。风机雷电放电全过程电流测量系统对于风机接闪放电过程分析具有重要意义。 In order to study the whole process current for lightning striking wind turbine,this paper studied the difference of currents on various parts of wind turbine when lightning strikes wind turbine blade using electromagnetic transient simulation software ATP,then spectrum analyses are done to the currents.According to analyzing the simulation results,this paper designed the whole process current measurement system. The system selects rogowski coil and non-inductive resistor as sensors,rogowski coil was installed in hub and tower,and non-inductive resistor was installed in blade.Sensors were connected to the lightning measuring unit and the measurement unit transmitted the result to the terminal through the optical fiber. Performance test result shows that the system satisfies the acquisition requirements of lightning current.The whole process of lightning current measurement system is important for the analysis of wind turbine's lightning discharge process.
出处 《仪表技术与传感器》 CSCD 北大核心 2017年第10期46-49,54,共5页 Instrument Technique and Sensor
基金 国家电网公司2015年总部科技项目(SGTYHT/14-JS-188)
关键词 风力发电机 雷电流 主放电电流 预放电电流 传感器 电流测量 wind turbine lightning current main discharge current pre-discharge current sensor current measurement
  • 相关文献

参考文献4

二级参考文献68

  • 1曾嵘,陈未远,何金良,梁曦东,牛犇,耿毅楠.光电集成强电场测量系统及其应用研究[J].高电压技术,2006,32(7):1-5. 被引量:41
  • 2王成山,孙玮,王兴刚.含大型风电场的电力系统最大输电能力计算[J].电力系统自动化,2007,31(2):17-21. 被引量:37
  • 3潘艺,周鹏展,王进.风力发电机叶片技术发展概述[J].湖南工业大学学报,2007,21(3):48-51. 被引量:60
  • 4Les Renardières Group.Research on long air gap discharges at Les Renardières-1973 results[J].Electra,1974(35):49-156.
  • 5Hidaka K.Electric field measurements in long gap discharge using Pockels device[J].IEE Proceedings,1985,132(3):139-145.
  • 6Hidaka K.A new method of electric field measurements in corona discharge using Pockels device[J].Journal of Physics D:Applied Physics,1982,53(9):5999-6003.
  • 7Murooka Y.Modified Pockels sensor for electric-field measurements[J].IEE Proceedings of Science Measurement Technology,1994,141(6):481-485.
  • 8Gallimberti I.The mechanism of the long spark formation[J].Journal of Physics Colloques,1979(40):C7-193-C7-250.
  • 9Les Renardières Group.Positive discharges in long air gaps at Les Renardières 1975 results and conclusions[J].Electra,1977(53):31-152.
  • 10Les Renardières Group.Negative discharges in long air gaps at Les Renardières 1978 results[J].Electra,1981(74):67-218.

共引文献91

同被引文献39

引证文献3

二级引证文献7

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部