分包结算审计问题,角度不一样,重点及方法也不一样。从建设方的角度是如何控制工程造价,从承包方的角度是如何控制承包方风险和提高工作效率。通信工程项目承包方为控制风险,重点是审核材料的数量和价格、赔补的真实性;为提高工作效率,提出了四种操作可行的审核方法。
The key points and methods are not the same for subcontract settlement audit according to different perspectives. The construction side takes into account how to control the project cost while the Contractor side thinks about how to control the risk and improve the efficiency. In order to control the risk, the key points are the quantity, price of the audit material, and the authenticity of compensation. Therefore, in order to improve work efficiency, four kinds of feasible audit methods are proposed.