摘要 核电站设备组成复杂、技术含量及安全性要求高,日常维护保障费用需求高.核电站维护保障费用预算不足会造成设备失修,而太高则会造成资金浪费,不符合现代财务精细化管理的要求.本文基于1至4代核电设备的技术构成,对电功率、热功率、反应堆运行压力、运行温度、环路数等8项主要技术指标进行了原理分析,客观分析了其对维护保障费用的影响.因偏最小二乘法在处理样本容量小、自变量多、变量间存在众多多重共线性问题方面具有独特的优势,以核电设备主要技术指标作为影响因子,提出了基于偏最小二乘法的核电设备维护保障费用相关影响分析方法,为核电设备维护保障费用的参数法估算模型建立提供了影响要素的科学选取方法. Because of the complex composition high technical content and safety requirements of nuclear power equipment,the needs of daily maintenance cost were high.If the budget was shortfall,the equipment would be felled into disrepair,otherwise if the budget was too much,there would be a waste of money,and this didn't meet the requirements of the modern financial fine management.Based on technical composition of the first to fourth generation nuclear power equipment,8 main technical specifications such as electric power,thermal power,reactor operation pressure,running temperature and Loop number were analyzed in this article,and its objective analysis of main technical specifications which affected the cost of maintenance support were done.Since partial least squares(PLS)have unique advantages in dealing with small sample sizes,more independent variables and multi collinearityamongvariables,take main technical indexes of nuclear power equipment as influencing factors,thecorrelation analysis method sofinfluencing factors fornuclearpower equipment maintenance support cost were proposed based on PLS,and the scientific selection methods of influencing factors of parametric estimation model establishment were given for nuclear power equipment maintenance support cost.
作者 刘霄 LIU Xiao(School of Computer and Control Engineering, Yantai University, Yantai 264006, Chin)
出处 《测试技术学报》 2017年第5期384-391,共8页 Journal of Test and Measurement Technology
基金 2016年山东省重点研发计划(科技攻关部分)资助项目(2016GGX109004)
关键词 核电设备 维护保障费用 相关性分析 偏最小二乘法 变量重要性投影 nuclear power equipment maintenance cost correlation analysis method partial leastsquares (PLS) variable importance projection (VIP)
  • 相关文献

参考文献9

二级参考文献26

  • 1徐哲,刘荣.偏最小二乘回归法在武器装备研制费用估算中的应用[J].数学的实践与认识,2005,35(3):152-158. 被引量:24
  • 2张禄庆.第三代核电技术在中国核电发展中的作用[J].国防科技工业,2007(5):35-37. 被引量:3
  • 3RG1.90-1977,灌浆钢束预应力混凝土安全壳结构的在役检查[s].
  • 4IAEA Technical Reports Series No. 338, Methodology for the Management of Ageing of Nuclear Power Plant Components Important to Safety[S].
  • 5American Concrete Institute. Prediction of Creep Shrinkage and Temperature Effects in Concrete Structures [ M]. Michigan :Farmington Hills, 1997.
  • 6CAN/CAS-N287.7-96, In-Service Examination and Testing Requirements for Concrete Containment Structures for CANDU Nuclear Power Plants[ S].
  • 7钱筱丹,黎放,卞金露.偏最小二乘回归在舰船维修费用预测中的应用[J].舰船科学技术,2007,29(4):98-100. 被引量:17
  • 8国家发展和改革委员会.核电中长期发展规划(2005--2020)[R].北京:中国新闻网,2007.
  • 9Nuclear Emergency Response Headquarters Government of Japan. Report of the Japanese government to the IAEA ministerial conference on nuclear safety: The accident at TEPCO's Fukushima nuclear power stations[R]. Japan Japanese Government, 2011.
  • 10苏州热工研究院.中国核电国产化综述[J].核电信息周刊,2011,396f(37):1-65.

共引文献58

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部