齐热哈塔尔水电站工程深埋隧洞块状岩体岩爆区施工防护措施 被引量:6

Protection measures for construction in rock burst zone of blocked rock mass of deeply buried tunnel of Qireha Starr Hydropower Station Project
下载PDF
导出
摘要 以有效解决深埋隧洞工程施工中高地应力作用下的岩爆问题为目标,结合齐热哈塔尔水电站工程深埋引水隧洞的特点,针对不同位置、不同破坏模式的岩爆特点,采用了短进尺控制爆破开挖,配合应力解除爆破开挖、危石清理及高压水冲洗、及时喷射混凝土覆盖岩面、及时实施防岩爆锚固措施(包括快速锚杆、挂网、钢拱架等)和后续实施系统锚杆支护等一系列施工防护措施。结果表明:在板裂破坏与层裂破坏为主的区域,出现因锚杆角度不合适而出现持续破坏一般发生于中等岩爆区;局部应力集中严重的区域存在不规则块状弹射和剥落现象,一般发生于随机锚杆或系统锚杆的支护区;实际施工中应采用打设应力施放孔、在顶拱和掌子面范围内喷水、及时封闭开挖岩面等预防措施。研究成果可供其他地下工程岩爆区的施工防护参考。 By taking the effective solution of the problem of rock burst under the effect of high ground stress during the con- struction of deeply buried tunnel as the study objective, a series of protection measures, such as short footage control blasting excavation with stress relieving blasting excavation, dangerous rock cleaning with high pressure water washing, covering rock surface with jet concrete in time, implementing the measure of rock burst prevention anchorage ( including quick anchoring bolt, hanging net, steel arch support, etc. ) in-time, successive systematic rock bolt support, etc. are adopted for the rock burst characteristics of different locations and different failure modes in combination with the characteristics of the deeply buried tunnel for the project of Qireha Starr Hydropower Station. The result shows that in the area dominated by spalling failure and multi-layered failure, the continuous failure caused by improper angle of anchoring bolt normally occurs at the zone of medium rock burst, while the irregular block ejection and peeling phenomena in the area with serious local stress concentration general- ly arise in the zone supported with random anchoring bolt or systematic anchoring bolt, for which the preventive measures of drilling stress releasing hole, spraying water on arch crown and excavation face, sealing the excavated rock surface, etc. must be adopted. The study result can provide references for the construction protection of the rock burst zone in the other under- ground project.
出处 《水利水电技术》 CSCD 北大核心 2017年第10期93-97,共5页 Water Resources and Hydropower Engineering
基金 国家重点研发计划(2016YFC0401801)
关键词 深埋引水隧洞 齐热哈塔尔水电站 片麻状花岗岩 岩爆 岩爆区施工与防治 deeply buried tunnel Qireha Starr Hydropower Station gneissic granite rock burst construction and prevention inrock burst zone
  • 相关文献

参考文献8

二级参考文献20

  • 1谭以安.岩爆形成机理研究[J].水文地质工程地质,1989,16(1):34-38. 被引量:81
  • 2徐成光.岩爆预测及防治方法综述[J].西北水电,2005(2):14-17. 被引量:5
  • 3唐宝庆,曹平.引起岩爆因素的探讨[J].江西有色金属,1995,9(4):4-8. 被引量:20
  • 4周德培,洪开荣.太平驿隧洞岩爆特征及防治措施[J].岩石力学与工程学报,1995,14(2):171-178. 被引量:93
  • 5王梦恕.21世纪山岭隧道修建的趋势[J].铁道工程学报,1998,:4-7.
  • 6关宝树.21世纪的地下空间利用.铁道工程学报,1998,:553-557.
  • 7GBB50287-2006水利发电工程地质勘察规范[S].北京:中国计划出版社,2008.
  • 8华东勘测设计研究院.四川省九龙河江边水电站可行性研究报告(工程地质)[R].杭州:华东勘测设计研究院,2006.
  • 9华东勘测设计研究院.引水隧洞工程标开挖支护施工技术要求[R].杭州:华东勘测设计研究院,2006.
  • 10贾愚如,第二次全国岩石力学与工程学术会议论文集,1989年

共引文献201

同被引文献32

引证文献6

二级引证文献24

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部