3Kamath K Rajashree, T P M Pakkala. A Bayesian approach to a dynamic inventory model under an unknown demand distribution [J]. Computers & Operations Research, 2002 (29) :403 - 422.
4Croston J D. Forecasting and stock Control for Intermittent Demands [J]. Operational Research Quarterly, 1972, 23 (3) :289 -304.
5Willemain T R, Smart C N, Schwarz H F. A new approach to forecasting intermittent demand for service parts inventories [ J ]. International Journal of Forecasting,2004 (20) : 375 - 387.
6Batchoun P, Ferland J A , Cleroux R. Allotment of aircraft spare parts using genetic algorithms[J]. Pesquisa Operacional, 2003, 23 (1) : 141-159.
7Johnson P. Simulation of the number of spare engines required for an aircraft fleet[J]. Journal of the Operational Research Society, 1975, 29(1): 33-38.
8Memoire presente. Spare parts management and inventory control[D]. Dissertation for the Degree of Doctor of Philosophy, Facult e Des Sciences Et. De Genie Universite Laval, 1996.
9Boeing. Boeing commercial airplanes current market outlook overview 2005[R]. Washonton, DC: Boeing Company, 2005.
10Dinesh K U, Knezevic J. Availability based spare optimization using renewal process[J]. Reliability Engineering and System Safety, 1998. 59: 217-223.