期刊文献+

谈提高CRD法钢架安装合格率控制措施

Control measures for improving the qualified rate of steel frame installation in metro tunnel by CRD construction method
下载PDF
导出
摘要 开展质量管理小组活动是改进质量、降低消耗、改善环境、提升组织绩效的有效途径。通过对徐州地铁1号线05标段区间CRD工法大断面隧道提高钢架安装合格率开展的QC活动这一措施进行总结,进一步阐述QC活动在工程建设行业的重要作用。 Carrying out quality management team activities is an effective way improve quality,reduce consumption,improve environment and promote organizational performance. Based on the Xuzhou metro line No. 1 05 section of large section tunnel CRD method to improve the qualified rate of the installation of steel frame to carry out QC activities of this measures are summed up,further elaborates the important role of QC activity in the construction industry.
出处 《山西建筑》 2017年第29期254-255,共2页 Shanxi Architecture
关键词 地铁隧道 QC 钢架安装 合格率 措施 metro tunnel, QC,installation of steel frames,qualified rate,measures
  • 相关文献

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部