以一艘全长155.97m,右舷配备两台900t重吊的大开口海工重吊船为例,探究其在吊装过程中产生的横倾问题。概述了国内相关法规对吊装稳性的要求,并探讨在不使用辅助浮箱系统,仅通过压载水的合理调配来达到吊装要求稳性的工作流程,为同类型船舶的装卸操作提供参考。
Taking a large opening marine heavy lift carrier which is total length of 155.97 meters and equipped with two 900t crane at starboard side for example,the heeling problem is explored in the process of hoisting.It is summarized for the domestic relevant laws and regulations about the lifting stability requirement.Without using the system of buoyancy tank,it is studied on the process that is only through a appropriate deploying of ballast water to meet the requirements of hoisting,which provides the reference for the same kind of ship with loading and unloading operation.