摘要
介绍了一种计算多排顶管引起的地面沉降的方法,即考虑先施工顶管对后施工顶管的影响,后施工顶管的沉降曲线不对称,用这种方法计算了东扩区排水河道工程4排顶管施工引起的地面沉降,与工程施工实际监测的沉降基本吻合。
A calculation method of ground settlement induced by multi-row pipe jacking was introduced in this article. In the method, the effects of former pipe jacking were considered so that the settlement curve was not symmetrical. The example about the settlement of four pipes jacking in the drainage channel engineering of the eastern expansion area verified the calculation result keeping consistent with the actually monitoring settle-ment value.
作者
吴桂兰
迟守旭
常峻
Wu Guilan;Chi Shouxu;Chang Jun(China Water Resource Beifang Investigation Design Research Co., Ltd Tianjin 300222, Chin)
出处
《山西建筑》
2017年第31期202-204,共3页
Shanxi Architecture
关键词
多排顶管
先施工
后施工
影响
地面沉降
multi-rows pipe jacking former pipe jacking latter pipe jacking effects ground settlement