摘要
为提高工程管理质量,以某高速公路工程为例,分析了工程管理中存在的问题,并提出了相应的解决措施。通过对工程验收结果的观察发现,改进后的工程管理措施实施后,工程在工期内顺利完成,工程质量显著提升。表明,建立健全管理制度,从施工前、施工中、施工后三个阶段入手,加强对各施工环节的管理,对工程施工质量的提高具有重要价值。
In order to improve the quality of project management, based on a highway project as an example, analyzes the existing problems in the management of engineering, and puts forward corresponding solving measures. Through observation of the project acceptance and the results showthat the implementation of the project management measures improved after the successful completion of the project in the work period, project quality significantly improved. Show, establish and perfect the management system, from pre construction, construction, starting with the three stages of construction, strengthen the construction management of the construction quality, has an important value.
作者
筵晓明
Yan Xiaoming(Shanxi Lvliang Expressway Co. , Ltdf Fenyang 032200, Chin)
出处
《山西建筑》
2017年第31期226-227,共2页
Shanxi Architecture
关键词
高速公路
监理
竣工验收
highway, supervision, completion acceptance