期刊文献+

浅议罗闸河一级水电站建设要点

On construction main points of Luozha River Grade Ⅰ Hydropower Station
下载PDF
导出
摘要 为加快地方基础设施建设,缓解云南省临沧市云县电力供需矛盾,促进当地社会和经济发展,开发建设了罗闸河一级水电站。本文结合罗闸河一级水电站建设过程,总结建设要点,希望对类似水电站建设有一定参考和借鉴。 Luozha River Grade I Hydropower Station is developed and constructed in order to speed up the construction of local infrastructure,relieve the contradiction of power supply and demand in Lincang of Yunnan Province,and promote the local social and economic development. In the paper,the construction process of Luozha River Grade I hydropower station is combined for summarizing the construction main points,thereby it can provide certain reference for construction of similar hydropower stations.
作者 赵晓溪
出处 《水利建设与管理》 2017年第11期58-60,共3页 Water Conservancy Construction and Management
关键词 罗闸河 一级水电站 混合式 发电 建设要点 Luozha River Grade I Hydropower Station mixed power generation construction main points
  • 相关文献

参考文献2

共引文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部