摘要 在含大比例新能源的电力系统中,为消纳占比极小的新能源尖峰电量,需要占用系统大量的调峰资源,降低系统安全稳定性和经济性,若允许放弃一定的新能源电量,可以降低系统总体调峰需求,减少调峰电源建设,避免昂贵的边际消纳成本。首次在中长期扩展规划中探索新能源"合理弃能"问题,在新能源消纳成本和消纳效益中寻找平衡点,并采用GESP电源规划软件,计算电力系统安全经济发展下的新能源规划合理弃能率及该弃能率下的系统规划成本,并以中国各大区域电网为例,得到2020年的规划合理弃能率为3%~10%。 In a highly renewable power system, it will have to dispatch a large amnunt of peaking power to accommodate the renewable energy' s spike power that makes a very small proportion of the total renewable energy, which will reduce the safety and economics of the power system. If a certain amount of renewable energy is allowed to be abandoned, the system' s overall demand of peaking power will decrease, and subsequently the peak power sot, rce construction can be redueed and the expensive cost of marginal accommodation can bc avoided. The paper discusses for the first time the reasonable energy curtailment problem in the mid-and-long term power system expansion planning. By using the GESP power planning software, the reasonable energy curtailment rate and the system planning cost nndcr the curtaihnent rate is calculated lot the safety and economics of power system. It is concluded that the reasonable energy curtailment rate of the regional grids in China is 3%~ 10% in 2020.
出处 《中国电力》 CSCD 北大核心 2017年第11期8-14,共7页 Electric Power
关键词 人比例新能源 中长期规划 扩展规划 合理弃能问题 high proportion of renewable energy: mid-and-long term planning: expansion planning reasonable energy cnrtaihnent problem
  • 相关文献

参考文献9

二级参考文献100

共引文献310

同被引文献183

引证文献16

二级引证文献188

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部