期刊文献+

上下分体装配式预制管廊施工技术 被引量:23

Construction of Precast Utility Tunnel with Upper and Lower Assembly
下载PDF
导出
摘要 现浇施工作为传统施工工法,在城市管廊建设中逐步暴露出不足之处,使我们不得不对管廊的施工进行研究和改进。在工厂预先制成管廊构件产品,有效控制质量,具有施工效率高、工期短等优势,弥补了许多传统现浇施工的不足。对六盘水地下综合管廊项目上下分体装配式预制管廊施工技术进行了详细介绍,主要包括预制管廊结构设计方案、预制管廊生产及安装。 As a traditional construction method, cast-in-place construction has gradually exposed its shortcomings in the construction of utility tunnel, so that it has to study and improve its construction. The product of utility tunnel component made in advance can effectively control quality, and has the advantages of high construction efficiency, short construction period and so on, so that it can make up for many shortcomings of traditional cast-in-place construction. Based on the background of Liupanshui underground utility tunnel project, the upper and lower assembly construction is introduced in detail, which mainly include /he structural design scheme of utility tunnel, precast components production and installation.
作者 石立国 张耀 李海龙 陈博 SHI Liguo;ZHANG Yao;LI Hailong;CHEN Bo(China Construction Second Engineering Bureau Ltd. , Beijing 100160. Chin.)
出处 《施工技术》 CAS 北大核心 2017年第21期18-21,45,共5页 Construction Technology
基金 中国建筑第二工程局有限公司课题立项:城镇综合管廊关键施工技术研究(CSCEC2B-2015-K-03)
关键词 综合管廊 装配式 上下分体 安装 施工技术 comprehensive utility tunnel precast upper and lower assembly installation construction
  • 相关文献

参考文献6

二级参考文献7

共引文献116

同被引文献134

引证文献23

二级引证文献72

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部