摘要
以合肥地铁2号线青阳路站1号出入口暗挖工程为例,从施工过程控制角度,论述如何控制暗挖工程风险点。
Taking the underground excavation of Qingyang Road Station Exit l of Hefei Metro Line 2 as an example, this paper discussed how to control risk points of underground excavation from the view of construction process control.