摘要 针对较厚淤泥层、临近挡水围堰及其他复杂条件水下炸礁施工困难的问题,采用微差控制分段爆破技术,可有效解决这一难题。邕宁航运枢纽船闸引航道水下炸礁工程,采用具有RTK功能的GPS卫星定位系统辅助钻孔,有效解决了水流速度急、水下钻孔难度大、精准率低的问题,一次钻孔到设计深度,利用礁石上淤泥覆盖层吸收爆炸产生的多余能量,降低爆破振动和冲击波的危害,同时达到了较好的爆破效果,且一次完成清渣,减少对水体多次污染。 Short delay controlled segmental blasting technology is adopted to solve difficult problems affecting underwater reef blasting under the conditions of thick silt layer, cofferdam nearby water-retaining and so on. Based on the underwater reef blasting project of Yongning junction ship-lock approach channel, GPS with RTK function is used to assist drilling, and overcome difficulties such as rapid water flow, underwater drilling and low precision. The silt cover layer on the reefs ab- sorbed the over energy of blasting so as to reduce the hazards of blasting vibration and impact wave. This technology could make the hole drill to the design depth at a time. Meanwhile, this could achieve good blasting effects and reduce the repeat- ed water pollution as well as complete slag removal at one time.
出处 《铁道建筑技术》 2017年第10期123-126,共4页 Railway Construction Technology
基金 中国铁建股份公司科技研究开发计划课题(15-C40) 中国铁建港航局集团有限公司2015年度集团公司科技研究开发计划课题(2015-11)
关键词 分段爆破 水下炸礁 RTK功能 水冲击力 淤泥覆盖层 segmental blasting underwater reef blasting RTK function water impact force silt cover layer
  • 相关文献

参考文献11

二级参考文献84

共引文献70

同被引文献73

引证文献7

二级引证文献24

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部