期刊文献+

基于降雨过程的渗透型低影响开发设施的容积计算

Volume Calculation of Infiltration Type LID Facility Based on Rainfall Process
下载PDF
导出
摘要 在地方降雨强度公式的基础上,按照芝加哥雨型对降雨强度进行时程分配。概化出渗透型低影响开发(LID)设施的水力学概念模型,并利用差分的形式求解渗透型LID设施的水量平衡方程,得到LID设施不同分层的水量变化过程。将求解结果与传统的调蓄容积计算方法对比,结果表明基于降雨强度过程调蓄容积计算方法得到调蓄容积更准确,更经济,而且可以根据渗透型LID设施不同分层结构的水量过程进行结构设计,可以为海绵城市建设中低影响开发设施的规模计算提供一定的参考。 On the basis of the local rainfall intensity formula, the rainfall intensity is allocated according to the Chicago rain intensity. A conceptual model of hydraulics for generalized infiltration type LID facilities, and the water balance equations of the infiltrated LID facility are solved by differential method, which can derive the water change process of different layers of the LID facility. The results of the solution are compared with the traditional calculation method, which shows that the method is more accurate and economical than the traditional method and serve as a reference for the sponge city construction.
出处 《中国农村水利水电》 北大核心 2017年第11期78-82,共5页 China Rural Water and Hydropower
关键词 低影响开发 降雨强度过程 调蓄容积 渗透 水量平衡 low impact development rain intensity process storage capacity infiltration water balance
  • 相关文献

参考文献1

二级参考文献6

  • 1Urbonas B,Stahre P. Storm water:best management practice and detention for water quality, drainage, and CSO management [M]. PTR Prentiee Hall, c1993.
  • 2Brian R,P.E. Storm-water treatment goes underground [J].Civil Engineering-ASCE, Vol.60, No.7, July1996,pp.56-57.
  • 3Section 2.2 Storage design Georgia Storm water Management Manual. (http://www.georgiastormwater.com/vol2/2-2.pdf).
  • 4D. Butler, W.D. John. Urban Drainage. E & FN SPON.2000.
  • 5千叶県県土整备部.千叶県における宅地开発等に伴う雨水排水·贮留浸透计画策定の手引.平成18年9月.
  • 6孙慧修,郝以琼,龙腾锐,等.排水工程(第四版)上册[M].北京:中国建筑工业出版社,1999.

共引文献23

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部