期刊文献+

沿海平原排涝闸站前设置湖泊的作用 被引量:1

The Role of Storage Lakes in Coastal Plain Drainage Stations
下载PDF
导出
摘要 沿海平原排涝闸站在运行过程中,经常导致开闸排水时闸前水位很低而补水不及,关闸挡潮时闸前水位过高而上游涝区汇流不足。结合实例,从水力学角度分析闸前调蓄湖的排涝作用,进而说明排涝闸前设置调蓄湖泊的必要性。 During the operation of the coastal plain drainage station, the water level at the front of the gates is often going down very fast when the gates open, failing to coverage enough water and make the most use of the drain capacity. On the contrary, the water level may rise quickly when the gates closed, causing that the water cannot going downstream fast enough because of the little hydraulic slope. In this paper, an example is given to analyze the drainage effect of the lake before the sluice gate from the point of view of hydraulics, and then to illustrate the necessity of setting up a lake for storage before the drainage station.
出处 《中国农村水利水电》 北大核心 2017年第11期139-142,154,共5页 China Rural Water and Hydropower
基金 浙江省水利厅重大科技项目"浙江省沿海平原防洪排涝关键技术研究"(RA1501)
关键词 排涝闸 湖泊 补水 滞洪 drainage station storage lake water replenishment flood detention
  • 相关文献

二级参考文献1

  • 1武汉水利电力学院.明渠不恒定流的基本理论和计算方法.水利电力科技,1980,(2).

共引文献9

同被引文献5

引证文献1

二级引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部