结合某矮塔斜拉桥挂篮施工、监控项目案例,分析了带前吊杆的组合式前支点挂篮对施工控制的影响,提出了桥梁施工控制的内容和思路。同时,对挂篮初步设计方案进行了复核,明确了挂篮结构可能存在的问题。
Combined with the hanging basket construction and monitoring project case of a low tower cable-stayed bridge, this paper analyzed the influence of combined front pivot hanging basket with the front boom on the construction control, and put forward the content and thought of bridge construction control. At the same time, it also reviewed the preliminary design scheme of the hanging basket and defined the possible problems of the hanging basket structure.