期刊文献+

Civil 3D软件开发及其在尾矿库库容计算中的应用 被引量:4

Software development of Civil 3D and its application in the storage capacity calculation of tailings pond
下载PDF
导出
摘要 针对上游式尾矿库提出利用Civil 3D进行库容计算的方法,并通过对软件平台进行开发,使之操作流程大大简化,设计效率得到提高。工程实例应用结果显示,由Civil 3D获得的三维曲面直观,库容计算结果准确。尤其是在新建尾矿库库(坝)址方案比选中优势突出,具备一定的实用价值,可供业内同行参考。 This paper proposes to calculate the storage capacity of the upstream tailings pond with software Civil 3D.Through the development to the software platform,the operation flow is greatly simplified and the design efficiency is improved.Its specific engineering applications demonstrate that the three-dimensional surfaces are intuitive and the calculation results of storage capacity are accurate.This method,which might offer reference for peers in the same field,has certain practical value and exhibits obvious advantages especially in the scheme comparison and selection of the newly-built tailings pond site.
作者 傅灿 文枚
出处 《有色金属(矿山部分)》 2017年第6期100-104,共5页 NONFERROUS METALS(Mining Section)
关键词 尾矿库 库容 CIVIL 3D 软件开发 tailings pond storage capacity Civil 3D software development
  • 相关文献

参考文献3

二级参考文献3

共引文献40

同被引文献13

引证文献4

二级引证文献7

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部