摘要
总结了大跨钢箱梁的结构特点,介绍了大跨钢箱梁吊装施工中的三个主要阶段,分析了整体吊装法在施工过程中,通过线形控制和应力监测来实现大跨钢箱梁在安装过程中的质量控制,以满足工程的精度、安全性和稳定性的要求。
The structural characteristic and three main stages of the overall lifting construction of the large span steel box beam are analyzed. The quality control of the large span steel box beam in the overall lifting construction process is obtained thought the linear control and the stress monitoring to meet the requirements of accuracy,security and stability in the engineering application.
出处
《山西建筑》
2017年第32期165-166,共2页
Shanxi Architecture
关键词
钢箱梁
结构特点
整体吊装法
线形控制
应力监测
steel box beam
structural characteristic
overall lifting method
linear control
stress monitoring