水泥-乳化沥青冷再生技术破乳时间评价方法研究 被引量:2

Research on evaluation of the cold recycled cement-emulsified asphalt asphalt process demulsificational time
下载PDF
导出
摘要 现有的乳化沥青破乳时间通过人为观测来确定,会因个人及环境等条件的不同,致使破乳时间存在不准确性。本文在不同养护时间下,通过旋转压实方法成型多组马歇尔平行试件,记录不同养护条件下试件的压实圈数、压实高度及曲线变化,通过不同压实圈数对应的压实高速曲线,及不同养护时间下的15℃劈裂强度曲线拐点,确定冷再生技术的破乳时间。结果表明,与人为定性观测4小时破乳相比,养护时间在5小时成型的试件,压实高度递减至最小,15℃劈裂强度递增至最大,出现破乳时间拐点。因此,通过该种方法定量表征水泥-乳化沥青冷再生技术破乳时间更精确。 The transportation and construction time of asphalt mixture are limited by demulsification speed of cement-emulsified asphalt cold recycled technology,and the roller compacted time is affected by the working time,too.The time of demulsification is identified by artificially qualitative observations at current time. It observed artificially and qualitatively is different due to the different people and different environment.False appearance of demulsification can lead to the appearance that the real demulsification time is determined difficultly. In the paper, many marshall specimens form in different curing time, and then observer quantitatively the vary of compaction laps, compaction height,15℃ splitting strength.The results show that, compared with the 4 hours of artificial qualitative observation, the curing time of the specimens formed in the form of the curing time of 5 hours decreased to the minimum,and the splitting strength increased to the maximum at the temperature of 15 ℃,and the turning point of demulsification time appeared. Therefore,this evaluation method can be used to characterize quantitatively the time of demulsification of cement-emulsified asphalt cold recycled technology.
作者 张军仁
出处 《中国建材科技》 2017年第5期66-68,共3页 China Building Materials Science & Technology
关键词 冷再生技术 破乳时间 压实曲线 评价方法 cold recycling technology time of demulsification compaction curve evaluation methods
  • 相关文献

参考文献7

二级参考文献30

  • 1赵宝平.国内外公路养护技术分析研究[J].交通标准化,2005,33(5):99-103. 被引量:23
  • 2左景奇,姜其斌,傅代正.板式轨道弹性垫层CA砂浆的研究[J].铁道建筑,2005,45(9):96-98. 被引量:52
  • 3金守华,陈秀方,杨军.板式无碴轨道用CA砂浆的关键技术[J].中国铁道科学,2006,27(2):20-25. 被引量:69
  • 4WANG Qiang, YAN Peiyu, A Ruhan, et al. Strength mechanism of cement-asphalt mortar[J]. J Mater Civ Eng, 2011, 23:1353-1359.
  • 5NADIA P, JACQUES M, MICHEL P. Hydration mechanisms, microstructure, and mechanical properties of mortars prepared with mixed binder cement slurry-asphalt emulsion[J]. J Mater Civ Eng, 2003, 15:54-59.
  • 6WANG Fazhou, LIU Zhichao, WANG Tao, et al. A novel method to evaluate the setting process of cement and asphalt emulsion in CA mortar[J]. Materials and Structures, 2008,41:643-647.
  • 7TAN Yiqiu, OUYANG Jian, LYU Jianfu, et al. Effect of emulsifier on cement hydration in cement asphalt mortar[J]. Construction and Building Materials, 2013,47:159-164.
  • 8WANG Fazhou, LIU Yunpeng, ZHANG Yunhua, et al. Experimental study on the stability of asphalt emulsion for CA mortar by laser diffraction technique[J]. Construction and Building Materials,2012,28:117-121.
  • 9WANG Fazhou, LIU Zhichao, HU Shuguang. Early age volume change of cement asphalt mortar in the presence of aluminum powder[J]. Materials and Structures, 2010,43:493-498.
  • 10ZENG Xiaohui, XIE Youjun, DENG Dehua. Conductivity behavior of the fresh CA mortar and its relationship with the fluidity properties[J]. Construction and Building Materials,2012,36:890-894.

共引文献74

同被引文献16

引证文献2

二级引证文献10

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部