摘要
通过对某电厂在微网运行情况下厂用电切换过程中暴露出来的问题进行总结,机组跳闸后厂用电切换方式和逻辑动作过程的分析,进一步制定微网运行时厂用电切换改进措施。
The problems emerging during the power switchover process of microgrid operation in a power plant are summarized, the power switching mode and logic action process after plant tripping are analyzed and measures to improve power switching mode for plant auxiliary power of microgrid operation are drawn up.
出处
《冶金动力》
2018年第1期10-11,19,共3页
Metallurgical Power
关键词
厂用电
快切装置
措施
plant auxiliary power
fast switchover device
measure