摘要
对于采矿工程而言,对测量、施工精度要求非常高,数据不准确,工程剖面图存在很大误差,那么开采的位置就会发生变化,浪费大量的人力物力,同时还要重新设计施工,耽误工程进度。在当前施工中应用了CAD软件,但是其很难满足采矿工程的精度要求,针对这一情况,技术人员将CAD设置为辅助作用,然后研究了采矿工程剖面图计算机成图系统。
For the mining engineering, to measure and construction precision requirement is very high, if the data is not accurate, engineering section, there is a big error will change the location of production, waste a lot of manpower material resources, but also to design and construction, delay the project process. In the current construction of the application of CAD software, but it is difficult to meet the needs of mining engineering accuracy requirement, to remedy the situation, technical personnel set CAD to auxiliary function, and then studied mining engineering section of computer mapping system.
出处
《煤矿机械》
2017年第11期159-161,共3页
Coal Mine Machinery
基金
陕西省教育厅科研计划项目(16JK1395)
关键词
采矿工程
剖面图
计算机生成
mining engineering
section
computer generated