期刊文献+

《铁路防雷及接地工程技术规范》TB10180-2016解读 第四篇 施工及施工质量验收

Interpretation of Technical Specifi cation of Railway Lightning Protection and Grounding TB10180-2016(Chapter 4:Construction and Acceptance of Construction Quality)
下载PDF
导出
摘要 介绍了《铁路防雷及接地工程技术规范》的施工及施工质量验收,主要内容包括施工章节的基本规定、施工准备及综合接地施工,验收章节的基本规定、综合接地贯通地线、接地体及接地端子及等电位连接等。 The construction and acceptance of construction quality in the Technical Specification for Lightning Protection and Grounding Works for Railway are described, mainly including basic provisions of construction, preparation of construction, construction of integrated grounding, basic provisions of acceptance of construction quality, run-through grounding cable, earth elec- trode, earth terminal, equipotential bonding and so on.
作者 吴歆彦
出处 《铁道通信信号》 2017年第11期35-39,共5页 Railway Signalling & Communication
关键词 铁路 技术规范 工程 综合接地 施工质量验收 Railway Technical specification Work~ Integrated grounding Acceptance of con-struction quality
  • 相关文献

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部