摘要 随着既有站成为综合交通枢纽,需要对其进行规划和改造。以邢台东站为例,通过概况分析、客流量与规模预测,归纳邢台东站综合交通枢纽现状核心问题;通过思路比选,提出推荐研究思路,说明其规划设计要点,总结既有站综合交通枢纽规划改造的工作要点。 To change an existing railway station to a comprehensive traffic hub,planning and renovation are required. Taking Xingtai East Railway Station as an example,this study concludes core issues of Xingtai east railway station traffic hub based on the analysis of the general situation and the forecast of passenger flow and construction scale, and puts forward recommended research concepts. It also illustrates key points of planning and designing and summarizes work focuses in planning and renovation of the existing comprehensive traffic hub.
作者 贠毅超
出处 《铁道标准设计》 北大核心 2017年第12期110-114,共5页 Railway Standard Design
关键词 铁路客站 既有站 综合交通枢纽 规划 改造提升 Railway Passenger Station Existing railway station Comprehensive traffic hub Planning Renovation
  • 相关文献

参考文献15

二级参考文献64

共引文献140

同被引文献21

引证文献3

二级引证文献11

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部